Project Code: HIN-BOPMA.
Name of Project: BOPMA Coal Mining.

Coal mining location: sub district Mentawir, District Paser Penajam Utara, East Kalimantan province, INDONESIA. The air flight from Jakarta to Balikpapan 75 minutes then continue 2 hour to mine site through Samboja by public road. The distance from coal mine to jetty is only 4 km at Semoi river. By barge 270 feet transshipment to BCT Balikpapan Coal Terminal is 40 km or 3 hour.

5000 Ha IUP Exploration areas and 500 Ha IUPP operation and production. 15 boreholes, found 3 seams, coal tickness 3-4 m, SR 1: 5, coal resources 5,614,661 MT. The coal quality as follows:

No

Parameter

Specification

 

1

TM (ar)

12,00 ~18,00%

 

2

IM (adb)

5 ~ 11%

 

3

ASH (adb)

4 ~ 8%

 

4

VM (adb )

36 ~ 42%

 

5

FC (adb)

By Diffference

 

6

TS (adb)

0.6 ~ 1.6%

 

7
8

GCV  (adb)
HGI

6000 ~6700 Kcal/kg
48-50

 

 

Crushing Plant capacity 450 tph, closets mining pit 4 km from loading port, 4 Ha areas of loading port, loading conveyor 300 tph, 15 meter hauling road width.


Opportunity: HARVESTINDO open for non-equity participation with royalty basis per tonnage.


Contact:
Dr. D. Didik Sucahyo Oei
CEO of HARVESTINDO
Email: dr.d@harvestindo.biz

download pdf document contact us about this project

Available Menu
client login

If you are a client of ours, you will have login details to access this environment. It will enable you to view all specific data.
client login