
LA: NEW YORK: LONDON: BEIJING: HONGKONG: TOKYO:
Coal mining location: sub district Mentawir, District Paser Penajam Utara, East Kalimantan province, INDONESIA. The air flight from Jakarta to Balikpapan 75 minutes then continue 2 hour to mine site through Samboja by public road. The distance from coal mine to jetty is only 4 km at Semoi river. By barge 270 feet transshipment to BCT Balikpapan Coal Terminal is 40 km or 3 hour.
5000 Ha IUP Exploration areas and 500 Ha IUPP operation and production. 15 boreholes, found 3 seams, coal tickness 3-4 m, SR 1: 5, coal resources 5,614,661 MT. The coal quality as follows:
No |
Parameter |
Specification |
|
1 |
TM (ar) |
12,00 ~18,00% |
|
2 |
IM (adb) |
5 ~ 11% |
|
3 |
ASH (adb) |
4 ~ 8% |
|
4 |
VM (adb ) |
36 ~ 42% |
|
5 |
FC (adb) |
By Diffference |
|
6 |
TS (adb) |
0.6 ~ 1.6% |
|
7 |
GCV (adb) |
6000 ~6700 Kcal/kg |
|
Crushing Plant capacity 450 tph, closets mining pit 4 km from loading port, 4 Ha areas of loading port, loading conveyor 300 tph, 15 meter hauling road width.

Opportunity: HARVESTINDO open for non-equity participation with royalty basis per tonnage.
Contact:
Dr. D. Didik Sucahyo Oei
CEO of HARVESTINDO
Email: dr.d@harvestindo.biz