
LA: NEW YORK: LONDON: BEIJING: HONGKONG: TOKYO:
Location at sub district Manaar Bulat, district Kutai Barat, East Kalimantan province – Indonesia. 8 coal properties with 42K Ha. Mostly the coalspecification as follows: TM (ar): 32.2~47.0%; IM (adb): 15.0~17.0%; Ash (adb): 3.9~6.8%; VM (adb): 39.6~44.2%; FC (adb): 35.2~40.4%; TS (adb): 0.25~0.50%; GCV (adb): 5.050 ~ 5890 kcal/kg. Some properties has drilled, 71 bore holes with 2365 m total depth drilling. SR 1: 2~4, 5 seams tickness 1.5 m upto 6.1 m each seam, dip 4~6o. Estimate coal reserve of total properties is 0.45 Billion Tons.
Hauling distance to Mahakam river: 2 km upto 30 km, 300 km transshipment by 270-300 ft barge to open sea anchorage at Samarinda areas.
Location Map :

Contact:
Dr. D. Didik Sucahyo Oei
CEO of HARVESTINDO
Email: dr.d@harvestindo.biz
Dennis Alberga
CEO HARVESTINDO EUROPE
dennis@harvestindo.biz